Construction Safety Manager- Data Center Construction Job at Strategic Direct Solutions, LLC, Santa Teresa, NM

  • Strategic Direct Solutions, LLC
  • Santa Teresa, NM

Job Description

Job Description

Job Description

Job Type: Full-Time / Temporary Contract (Long-Term Project)

Project Duration: This is a temporary, project-based position with an anticipated duration of at least 12 months. Depending on project timelines, workload, and client needs, assignments may be extended for an additional 1–2 years, with the potential for projects to span 2–3 years total.

Job Overview

Strategic Direct Solutions (SDS) is seeking experienced Construction Safety Managers to support multiple large-scale data center construction projects across the United States. This position will be responsible for overseeing daily jobsite safety operations, ensuring compliance with OSHA regulations, implementing safety procedures, and promoting a safe working environment for all personnel.

Ideal candidates will have a strong background in commercial or industrial construction safety, preferably within data centers, electrical infrastructure, or large-scale construction projects.

Key Responsibilities

  • Oversee and enforce all jobsite safety policies, procedures, and OSHA regulations.
  • Conduct daily safety inspections, site walkthroughs, and hazard assessments.
  • Lead daily toolbox talks, safety meetings, and new-hire safety orientations.
  • Monitor construction activities involving electrical installations, overhead infrastructure, material handling, aerial lifts, and power distribution systems.
  • Identify potential safety hazards and implement corrective actions to prevent incidents.
  • Ensure proper use of PPE, fall protection, and safe work practices.
  • Review Job Hazard Analyses (JHAs), Job Safety Analyses (JSAs), and other required safety documentation.
  • Investigate workplace incidents, near misses, and safety concerns, providing detailed reports and corrective action recommendations.
  • Maintain accurate safety records, inspection reports, and compliance documentation.
  • Coordinate with project managers, site supervisors, subcontractors, and client safety representatives to maintain a safe and compliant work environment.
  • Monitor compliance with Lockout/Tagout (LOTO), electrical safety, ladder safety, and equipment operation procedures.

Qualifications & Requirements

  • Previous experience in construction safety management or site safety supervision.
  • Experience working on large-scale commercial, industrial, electrical, or data center construction projects preferred.
  • Strong knowledge of OSHA construction standards (29 CFR 1926).
  • OSHA 30 Construction certification required.
  • CHST, CSP, OSHA 510, or OSHA 500 certifications strongly preferred.
  • Familiarity with electrical safety standards, including NFPA 70E, is a plus.
  • Experience conducting safety inspections, incident investigations, and safety training.
  • Strong communication, organizational, and leadership skills.
  • Ability to work independently in a fast-paced construction environment.
  • Proficiency in maintaining safety documentation and reporting.
  • Must be comfortable working on active construction sites and coordinating with multiple trades.

Additional Information

SDS is staffing Safety Manager positions across multiple ongoing and upcoming data center construction projects nationwide. Project locations, schedules, compensation, and assignment durations will vary depending on site requirements.

Apply Today

Qualified candidates are encouraged to submit an updated resume highlighting relevant construction safety experience, certifications, and previous project involvement.

Strategic Direct Solutions (SDS)
Supporting Critical Infrastructure & Data Center Construction Nationwide

\nCompany Description

OUR VALUES

· Acting Like an Owner

· Assuming Positive intent in all employee interactions

· Being passionate about your work

· Challenging yourself in personal development

· Being tireless in exceeding customer expectations

· Assisting others to be successful as a team

· Owning our own mistakes quickly

· Talking with people and NOT about them

Company Description

OUR VALUES\r\n\r\n· Acting Like an Owner\r\n\r\n· Assuming Positive intent in all employee interactions\r\n\r\n· Being passionate about your work\r\n\r\n· Challenging yourself in personal development\r\n\r\n· Being tireless in exceeding customer expectations\r\n\r\n· Assisting others to be successful as a team\r\n\r\n· Owning our own mistakes quickly\r\n\r\n· Talking with people and NOT about them

Job Tags

Full time, Temporary work, For subcontractor

Similar Jobs

Asbury Automotive Group

Full-Stack Web Developer Job at Asbury Automotive Group

 ...Full-Stack Web Developer Sandy Springs, GA, USA Requisition ID Req #8390 About Asbury Asbury Automotive Group (NYSE: ABG) is...  ...Retailer . At Asbury, we work together to provide exceptional experiences for our guests while promoting a fun, supportive and... 

Lit at Night Enterprises LLC

Financial Consultant Job at Lit at Night Enterprises LLC

 ...guidance on financial planning, savings, investments, and wealth management.* Recommend suitable...  ...experience in financial services, banking, sales, or financial advisory; fresh graduates may be considered for entry-level roles (Preferred).* Knowledge of financial... 

Toyota

2027 TFS Data Science Internship Job at Toyota

 ...immigration-related employment (e.g., H-1B, O-1, E-3, H-1B1, TN, F-1 OPT, F-1 STEM OPT, F-1 CPT, 'job flexibility benefits' [also known...  ...Science team is looking for highly motivated, driven graduate students with an interest in technology, financial services, and the... 

TrueShort, Inc.

AI Music Composer & Editor Job at TrueShort, Inc.

 ...Katzenberg (Founder of DreamWorks), Scott Belsky, Ravi Nandan (A24), Khosla Ventures, and others.Role Overview We're looking for Music Composers to help define the musical identity of original series and films across a wide range of genres and formats.Music Composers are... 

Public Equity Llc

UIC Illuminate Paid Internship Program - Community Impact Job at Public Equity Llc

 ...project-based internship opportunities for students interested in community impact, violence...  ..., and organizational planning while working alongside experienced nonprofit professionals...  ...transformative internship experience. Flexible work from home options available....